1. Project : 135 MW, Near
Tadkeshwar, Mandvi Taluka, Surat District, Gujarat State
2. Plant Configuration : 1 X 135
MW
3. Location : Kim-20 km on Mumbai,Ahmedabad broad gauge Line of Western
Railway
4.
Land
requirement are : About 60 hectares
5.
Source
of water : Tapi River or Kakrapal canal
6.
Water
requirement : About 550 M3/hr.
7.
Cooling system : Closed cycle using
induced draft cooling tower
8.
Primary fuel requirement :
Lignite : 125 TPH
Limestone : 20 TPH
9.
Secondary Fuel : LDO from nearest
depot
10.
Steam
generator : Circulating Fluidized Bed
Combustion Boiler
11.
Steam turbine : Condensing,
tandem compound, reheat, multistage,multi cylinder, 3000 RPM.
12. Control
System : Distributed Digital Control & Management
Information System
13.
Stack : Single Flue Stack of 91 meters
height
14.
Power
Evacuation : At 220 KV level to GUVNL system for captive
use
15.
Project completion Period : 30-32 months from
zero data
|